We draw the energy from a sustainable and renewable source, which allows us to benefit from green and low-cost electricity.
Hydroelectric plants in Russia
TOP 5
Our hosting facility is located 800m away from the Boguchany Dam (Boguchanskaya) - a hydroelectric plant on the Angara River in Siberia, which was fully completed in 2017.
Installed capacity =
2997 MW
17.6 TWh
Annual generation =
GREEN ELECTRICITY
Advantages
STELLA
Equipment set up
Routine Maintenance
24/7 Support service
24/7 armed security
24/7 monitoring
Key advantage of working with Stella is transparent pricing and the benefits we offer to our mining partners.
The price of $0.057 per kW/h already includes VAT and the full package of assistance and services necessary for success:
Once the ASIC miners are delivered to the facility our team of experts will set it up and test without any additional charge.
Our team, camera, security and control systems work around the clock to ensure safety and productivity.
Cleaning, Hashrate control, Voltage control and etc.
Our support team members are available day and night to assist our clients from around the world.
We emphasize safety and protection for your business and equipment.